
This product is no longer available. Please call customer service for assistance at 1-800-345-4545.
CURT tow bar base plates are engineered for a custom fit on each unique vehicle. This custom tow bar base plate fits select years of the Jeep Wrangler TJ (see application info to verify fitment). This Jeep Wrangler TJ tow bar baseplate is constructed from high-quality steel and is precisely welded for a perfect fit. It is physically tested for absolute safety and peace of mind while dinghy towing. It also features a unique co-cured finish of liquid A-coat and highly durable powder coat to protect against the outdoor elements. This base plate for towing comes with attachment tabs, safety cables and installation hardware.
58445 Long-Lead Mini Fuse Bypass Switch Features:
- Helps Avoid Having To Remove And Replace Fuses When Flat Towing
- Vehicle-Specific Application For A Custom Fit
- Integrates With Curt RV Harness (Sold Separately)
- Includes Bypass Harness/Fuse Holder And Other Components
- Fuse Not Included
- 20 Amp Max
![MIG 100 Gasless Wire Welder [110V AC]](https://www.jegs.com/images/mini_200/500/555/555-81540.jpg)
![MIG/Arc Welder, 180C [220V AC]](https://www.jegs.com/images/mini_200/500/555/555-81541.jpg)
![TIG 200 DC Welder [120/220V]](https://www.jegs.com/images/mini_200/500/555/555-81542.jpg)

![Welding Cart [36 1/2 in. L x 17 3/8 in. W x 30 1/2 in. H]](https://www.jegs.com/images/mini_200/500/555/555-81639.jpg)

![Cut-Off Wheels [3 in. Diameter, Set of 4]](https://www.jegs.com/images/mini_200/500/555/555-m580c.jpg)

![3-Piece Wire Brush Set [Stainless Steel, Brass Bristles with Plastic Handle]](https://www.jegs.com/images/mini_200/500/555/555-w1149.jpg)
![Magnetic Support Jig [Holds up to 25 pounds]](https://www.jegs.com/images/mini_200/500/555/555-w41291.jpg)
![Magnetic Support Jig [Holds up to 75 pounds]](https://www.jegs.com/images/mini_200/500/555/555-w41293.jpg)

![3-Ton Aluminum Floor Jack [6,000 lbs. Capacity]](https://www.jegs.com/images/mini_200/500/555/555-80077.jpg)

![Wheel Chock [Solid Rubber]](https://www.jegs.com/images/mini_200/500/555/555-w41001.jpg)
![1/2 in. Drive Torque Wrench [10 to 150 ft. lbs.]](https://www.jegs.com/images/mini_200/500/555/555-m200db.jpg)